Link geometry to a readable drawing
A production CAD file and its PDF proof should identify the same part and revision. The CAD file supplies geometry, while the readable drawing explains dimensions, tolerances, orientation and notes. Keep them together in the release package. If they differ, establish which file is corrected before accepting the order for manufacture rather than leaving the workshop to choose.
Remove ambiguity from filenames
Use a stable part mark and explicit revision in the filename or controlled register. Identify preliminary quotation files separately from released production files. Avoid several attachments all named final, because recipients can easily save them in different folders and continue using an earlier copy. Tell the processor which files replace earlier issues and request acknowledgement of the accepted package.
Archive the accepted release
Record the release date, issuer and supplier acknowledgement. Keep the package used for manufacture available when inspecting the finished parts. If a drawing changes after release, use a change instruction that identifies affected quantities and work status. Deleting an obsolete file from a shared folder is not evidence that downloaded copies have been withdrawn from production.
A practical record structure
| Record | Information to agree |
|---|---|
| Part mark | Same identity in CAD and PDF |
| Revision | Accepted issue for both files |
| Status | Quotation or production release |
| Acknowledgement | Recipient and confirmation date |
Before closing the review
- Check CAD and PDF together.
- Separate preliminary and released packages.
- Archive the accepted manufacturing issue.
Read the weathering steel plate buying guides and include the accepted records with your project inquiry.
