Choose one governing dimensional basis
An inquiry may include a metric drawing, an inch-based parts list and a CAD file with no obvious unit declaration. State which document and unit system govern manufacture. Treat converted dimensions as supporting information unless the purchaser explicitly accepts them as the production basis. A label saying both metric and imperial does not resolve conflicts between rounded values.
Check files with a known reference
Ask the processor to confirm file scale against a clearly dimensioned reference feature before nesting. Review hole sizes, bend references and tolerances as well as the overall outline. Decimal precision can be lost during conversion, while a displayed dimension can remain unchanged even when imported geometry has the wrong scale. Record the agreed check with the file revision.
Approve conversions through the drawing process
Put any accepted converted dimensions on a controlled drawing or schedule. Do not rely on a separate spreadsheet maintained by one production operator. Where a discrepancy affects fit or a specified tolerance, refer it to the responsible designer before cutting. The inspection record should identify the same governing units, rather than reporting a different rounded value after manufacture.
A practical record structure
| Record | Information to agree |
|---|---|
| Drawing units | Explicit governing system |
| CAD scale | Known reference feature |
| Tolerance | Accepted value after conversion |
| Inspection | Same units as the released drawing |
Before closing the review
- Declare the governing units.
- Confirm imported geometry scale.
- Approve conversions before manufacture.
Read the related buying guide and include the accepted records with your project inquiry.
