Choose the stage for the decision
A hold point should have a clear purpose: a decision or observation must occur before the next operation proceeds. Locate it against the actual manufacturing route. Material identity may need review before cutting, while an inaccessible interface may need inspection before assembly closes it. Adding an inspection to the end of the order cannot recover evidence that is no longer visible.
State release authority and notice
Name the party who can release the hold, the required notice and the records they need. Distinguish a mandatory stop from a witness opportunity or a document review. If attendance is not possible, agree the response through the purchase requirements rather than assuming that an unanswered email automatically permits production to continue.
Keep evidence with the release
The release record should identify the relevant material or parts, inspection stage, drawing revision and outcome. Describe any accepted condition or outstanding action. Send that information to production and include it in the shipment records where required. A signed schedule with no link to the inspected components is much less useful when the buyer later asks what was actually checked.
A practical record structure
| Record | Information to agree |
|---|---|
| Material review | Before cutting removes parent marks |
| Hidden interface | Before final closure |
| First piece | Before repeating a batch |
| Dispatch release | Before the agreed shipping stage |
Before closing the review
- Choose stages from the real production route.
- Name the release authority.
- Keep evidence linked to the affected pieces.
Read the related buying guide and include the accepted records with your project inquiry.
